Applications of PVC Double Pipe

Electric pipe system; Underground duct

Conical Twin Screw Extruder for Dual Conduit Pipe
1. It produces twin pipe for two different diameters at the same time out of one mould;
2. Results in high production (120kg/h – 150kg/h) even for smaller sizes of pipe;
3. Special conical twin screw extruder can take high filler loading as compared to parallel twin screw extruder;
4. Counter rotating conical twin screw machined on CNC make thread milling machines by simulation software for better performance;
5. Bi-metallic screw and Barrel can be provided for getting two-three times more lifespan than nitrided screw and barrel.


Dual Pipe Die Head
1. Die Head for smaller sizes of pipe ranges from 16mm-63mm with stainless steel spider;
2. It ensures the production of dual pipe out of one mould, thus making the cost of production low;
3. It has reasonable flow channel design and special treatment on the surface;
4. Special flow channel design ensures the equal distribution of PVC in both moulds;
5. Melt temperature and pressure remain even.

Dual Pipe Vacuum Tank
1. Dual pipe vacuum tank ensures the production of one pipe does not stop, even if the production of second pipe is stopped due of any reason. Thus, making the wastage low. It is made of stainless steel;
2. Separated vacuum pump and water pump for two different vacuum chambers.


Dual Pipe Haul-Off
1. Its construction ensures the traction of two different pipes at two different speed thus enable the production of pipes of different diameters;
2. Drives is given through four geared motors to all four belts and synchronized with the help of AC frequency variable drive;
3. Gap between two tracks is adjusted through pneumatic cylinders.


Dual Pipe Cutting Unit
1. Its construction ensures the cutting of two pipes at different length and at different time;
2. Length of the pipe can be set with limit switch of tipping chute;
3. Functioning is “ PLC controlled”;
4. Special high speed blade for smooth cut.

Dual pipe Tipping Unit

It is provided with two individual unloading tables, so that both the pipes are stacked at different locations.




Product Type: China's  Quality Manufacturer for Double PVC pipe production line
Place of origin:China
Price Terms:EXW,FOB, CIF
Payment Terms:L/C,or T/T
Package:Wood Box, Wood pallet, tailor-made
Delivery Time:15-30Working days
Brand Name:WANROOETECH

Delivery Times
30-90 working days since receiving advance payment. If you cannot wait for this suggested delivery time, please contact us freely, we will make any arrangements we can to meet your requirements.
Packing
Wood Pallet, fumigation-free wooden cases if necessary. All the key parts of the equipment will be painted with anti-rust oil before shipment and packing.
Technical documents
WANROOETECH will offer you all necessary documents, e.g. general layout plan, electrical diagram and user manual after the contract is executed.
Arrangement for inspection, installation and testing work
After informed machines ready for inspection, customer can send engineers to WANROOETECH; Customer also can consign WANROOETECH to finish inspection work.
When the machines are delivered to customer's factory, please arrange preparation work before engineers arrive if require.
WANROOETECH will send technicians to the factory after preparation work is completed;
Technicians will be responsible for guide on-site installation and testing machines involved.
Meanwhile technicians will give free training lessons to labors in customer's factory.
The customer just needs to bear expenses generated for this work, e.g. airplane tickets (round-way), residency, meals and allowance of USD50 per day for each technician.
Quantity and quality guarantee
A: Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination.
B: Guarantee period and after-sales services:
12 month since installation finish and machine normal working. During this guarantee period, WANROOETECH will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, WANROOETECH will provide spare parts at cost.
C: Long-term service:
WANROOETECH will charge the buyer cost of spare parts beyond guarantee time and provide long-term technical guide.

Previous Product >>HDPE Pipe Extrusion Line

Next Product >>PVC pipe production line

Didn't find what you are looking for? Post a buying lead.

PVC pipe production line - manufacturer search on: Google, Yahoo, Msn

Related Searches:

News

>>More
Contact Us
Self introduction, required specifications and so on...






Tips: All the items above can not be empty.

Contact Us

Send Results

Close
Success! Thanks a lot for your inquiry!
We will contact you as soon as possible.