Language:
You are here: Home > Product List >PP PE Crushed Material Pelletizing Prodution Line> PP PE Crushed Material Pelletizing Line

PP PE Crushed Material Pelletizing Line

  • Description

  • Video

  • Business Terms

  • Equipment Service


The production of quality recycled pellets is your business.

Intoday’s competitive market, making superior extruded recycled products at maximum productivity levels and the lowest possible cost is paramount in growing your business, increasing profits and meeting your overall business objectives.

WANROOETECH has over 20 years of experience engineering innovative solutions that specifically enhance the extrusion process. WANROOETECH manufactures the most technologically advanced barrels, screws, screen changers, gear pumps, and in-line pelletizers that are designed specifically to optimize your recycling production. Process optimization starts with understanding the critical extrusion operating variables that contribute to your success. A single production component is only one element within a group of production components that collectively operate as a system.

Whether it is designing single components or integrating elaborate systems,WANROOETECH has the ability to provide integrated engineered solutions that take your process to its maximum level of performance.


Product Type:Plastic Film Washing Line
Place of origin:China
Price Terms:FOB, CIF
Payment Terms:L/C,T/T
Package:Wood Box, Wood pallet, tailor-made
Delivery Time:60-90 Working days
Brand Name:WANROOETECH

Delivery Times
30-90 working days since receiving advance payment. If you cannot wait for this suggested delivery time, please contact us freely, we will make any arrangements we can to meet your requirements.
Packing
Wood Pallet, fumigation-free wooden cases if necessary. All the key parts of the equipment will be painted with anti-rust oil before shipment and packing.
Technical documents
WANROOETECH will offer you all necessary documents, e.g. general layout plan, electrical diagram and user manual after the contract is executed.
Arrangement for inspection, installation and testing work
After informed machines ready for inspection, customer can send engineers to WANROOETECH; Customer also can consign WANROOETECH to finish inspection work.
When the machines are delivered to customer's factory, please arrange preparation work before engineers arrive if require.
WANROOETECH will send technicians to the factory after preparation work is completed;
Technicians will be responsible for guide on-site installation and testing machines involved.
Meanwhile technicians will give free training lessons to labors in customer's factory.
The customer just needs to bear expenses generated for this work, e.g. airplane tickets (round-way), residency, meals and allowance of USD50 per day for each technician.
Quantity and quality guarantee
A: Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination.
B: Guarantee period and after-sales services:
12 month since installation finish and machine normal working. During this guarantee period, WANROOETECH will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, WANROOETECH will provide spare parts at cost.
C: Long-term service:
WANROOETECH will charge the buyer cost of spare parts beyond guarantee time and provide long-term technical guide.

Didn't find what you are looking for? Post a buying lead.

PP PE Crushed Material Pelletizing Prodution Line - manufacturer search on: Google, Yahoo, Msn

Related Searches:

News

>>More
Contact Us
Self introduction, required specifications and so on...






Tips: All the items above can not be empty.

Contact Us

Send Results

Close
Success! Thanks a lot for your inquiry!
We will contact you as soon as possible.